EasyManua.ls Logo

Rauch AXIS-M 20.2 EMC - 8 General Commissioning (All Machine Types); Accepting the Machine

Rauch AXIS-M 20.2 EMC
236 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
General commissioning (all machine types)
49
8
AXISAXIS
8 General commissioning (all machine types)
8.1 Accepting the machine
When accepting the machine, please check the completeness of the delivery.
The standard equipment includes:
1 mineral fertiliser spreader of the AXIS series,
1 operator’s manual AXIS 20.2, AXIS 30.2, AXIS 40.2, AXIS 50.2
1 fertiliser chart (on paper or CD)
1 calibration kit comprising chute and calculator
Lower link and upper link pins
1 spreading disc set (according to order)
1 universal drive shaft (including operator’s manual)
1 agitator
Protective grids in hopper
Version Q or W: QUANTRON-A operating unit
AXIS 30.2 W ISOBUS, AXIS 40.2 W ISOBUS, AXIS 50.2 W ISOBUS: ISO-
BUS machine control unit
Version C: Operating unit E-CLICK
AXIS 20.2/30.2/40.2 EMC (+ W): QUANTRON-E2 M EMC operating unit
Please also check any optional equipment that you ordered.
Check for any shipping damage or missing parts. Any shipping damage must be
confirmed by the shipping agent.
If in doubt, contact your salesperson or the manufacturer directly.
NOTICE
When receiving the machine, check that all attached components are correctly
and tightly seated.
The right-hand spreading disc and left-hand spreading disc must be mounted
facing the direction of travel.

Table of Contents

Related product manuals