Maintenance and repair C
152
C.3 Lubrication of weighing spreader
Figure 18: Lubrication point of weighing spreader
C.4 Checking the screw connections of the weigh cell
The machine is equipped with 2 weigh cells and a tie rod. These elements are
fixed by means of screw connections.
Check the screw connections for the weigh cells and the tie rod for tightness on
both sides of the machine:
before every spreading season
also during the spreading season if necessary.
Checking:
1. Tighten the screw connec-
tion with a torque wrench
(Tightening torque =
300 Nm).
Figure 19: Fastening the weighing cell (on
the left side of the direction of
travel)