u
Remove the bolt.
u
Pull out the hydraulic cylinder.
Fig. 71: Pull out the hydraulic cylinder
u
A second person is required for this
step.
Person 1: Insert the lower link pin into the
metering opening (see Fig. 68 Lower link
pin in metering opening).
Person 2: Move the position indicator
towards smaller values until the metering
slide lines up with the pin [1].
Fig. 72: Move the position indicator
11. Maintenance and service
122