Index
016-0171-573 Rev. G 91
A
AccuFlow
Assembly
18
Charging the System 48, 51
Discharging the System 61
Emergency Shutoff Rope 37
Mounting 36
Pressure vs. Temperature Chart 76
Service and Maintenance 61
Servicing and Storing 65
System Diagram 80
Troubleshooting 71
AccuFlow HP+
Calibration & Operation
51
Charging the System 51
System Capacity Chart 57
Verifying Operation 58
AccuFlow HP+ Calibration and Operation 51
Charging the AccuFlow System
Adjusting Rate Cal 56
Default Calibration Values (NH3 presets) 52
Operating HP+ System in HP (NH3 Boost Mode) 58
Programming HP+ Rate Control - Viper Pro 53
Verifying AccuFlow HP+ Operation 58
AccuFlow NH3 Orifice Kit Instructions 46
AccuFlow Vortex
Calibration and Operation 43
Charging the System 48
System Capacity Chart 46
Verifying Operation 49
AccuFlow Vortex and AccuFlow HP+
System Diagram 80
AccuFlow Vortex System (non-pump) Calibration
and Operation
Programming NH3 Rate Controller
43
Entering Boom Cal 43
Entering Meter Cal 43
Entering Speed Cal 43
Verifying AccuFlow Operation 49
Assembly
Flow Meter
68
Installing Control Node 31
Installing Hydraulic Valve 34
Pump Upgrade 33
Vortex Cooler 66
C
Calculating the Required Capacity 45, 47, 56
Calibration
Boom Cal
43
Meter Cal 43
Pressure Transducers 51
Rate Cal 44, 56
Speed Cal 43
Valve Cal 44
Charging the AccuFlow System 46, 51
Checking for System leaks 41
F
Flow Meter
Housing and Assembly
68
Maintenance and Adjustment 68
H
Hydraulic Connections 35
I
Installation
AccuFlow Vapor and Applicator Plumbing
Installation
38
AccuFlow Vortex and AccuFlow HP+ 17
Assembling the AccuFlow 18
Attachign the Gauge Tree to the Cooler 22, 26
Check Valve Assembly (For Multiple Section Valves
Only) 23, 27
Cooler Bracket Assembly 18
Flow Meter and Outlet Manifold Assembly 19
Refrigerant Line Assembly 24, 27
Boost Pump Hyd Connections 39
Boost Pump Hydraulic Connections (HP+ System
Only)
31
Emergency Shut-off Rope Installation 36
Mounting the AccuFlow System 36
Emergency Shut-off Rope 36
Hydraulic Valve 34
Inlet Manifold Assembly
Single Inlet Manifold Assembly 30
Single Inlet Manifold Support Bracket
Installation 30
Installing Control Node 31
Mounting the AccuFlow 36
Pump Upgrade 33
Vapor and Applicator Lines 38
Vapor Port Assembly 37
Introduction
Updates
15
O
Overview 46
P
Pressure vs. Temperature Chart 76
R
Required Capacity 45, 56
Chart 45, 57