Installation: Installation 25
INSTALLATION
FIGURE 28. Installed Support Arm and Hardware
UPPER TANK SUPPORT INSTALLATION
1. Secure the left and right upper tank support to the upper support arm using the provided 5/8” washers, 5/8” -
11 x 2” bolts with thread locking compound. Tighten the bolts to 130 ft-lbs.
FIGURE 29. Upper Tank Support Installed
LOWER TANK SUPPORT INSTALLATION
1. Secure the small end of the lower tank support bracket to the tab with a 5/8” - 11 x 2” bolt, 5/8” washers (two
per bolt), and 5/8” nyloc nuts. Leave the brackets loose until tank bracket installation is complete.
2. Secure the left and right lower tank support to the upper tank support bracket using the provided 5/8 washers
(two per bolt), 5/8” - 11 x 2” bolts, and 5/8” nyloc nuts. Leave the fasteners loose until the installation of all tank
brackets is complete.
Upper Tank
Support
(116-0159-774)