EasyManua.ls Logo

Raypak TempTracker mod+ Hybrid - Staging Wiring Diagram

Raypak TempTracker mod+ Hybrid
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TempTracker mod+ Hybrid Installation and Operation Manual 55
HTC# 059105-00D
SYSTEM
A
B
C
D
1
2
RUNPROGRAM
DO NOT APPLY ANY VOLTAGE
TO INPUT TERMINALS
3
4
5
6
7
8
9
10
11
12
13
15
14
17
16
18
20
19
21
24
23
29
25
27
26
28
32
30
31
L
N
-
+
+
T
T
O
O
RS-485
mA
GND
VLT
SYS
A
B
C
D
PWR
CUR / VLT
A
-
+
+
mA
GND
VLT
-
+
+
mA
GND
VLT
+
+
mA
22
-
GND
VLT
+
mA
TEMP
OUTDOOR
O
O
TEMP
SYSTEM
EXTENSION
MODULE
CUR / VLT
B
CUR / VLT
C
CUR / VLT
D
PROVE
/DHW
SHUTDOWN
/SETBACK
FOR ALL CIRCUITS
120VAC, 6A RESISTIVE
OUTPUT RATINGS:
1A PILOT DUTY, 15A TOTAL
115VAC 60Hz , 30VA MAX
INPUT RATINGS:
USE COPPER WIRE,
CLASS 1 WIRE ONLY.
CAUTION
: RISK OF ELECTRIC SHOCK
More than one disconnect switch may be required
to de-energize the equipment before servicing.
ENCLOSED
ENERGY
MANAGEMENT
EQUIPMENT
99RA
/TSTAT
HYBRID
Outdoor Sensor
System Sensor
Prove Jumper
Do Not remove
Shield
Shield
L
N
System Pump
L
N
Two 2-Stage
boilers
Activation Signal
Two 2-Stage
boilers
Voltage Signal
Boiler 1
Boiler 2
Boiler 1
Boiler 2


Boiler Type = Staging
Boiler Number = 2
Output Type = 2-Stage


Table of Contents

Related product manuals