First Commissioning
23
5 First Commissioning
WARNING
W4.0002
Danger to life through electric shock
Damaged power cable
Operating the device with a damaged power cable or plug can lead to life-
threatening injuries caused by an electric shock.
Before operating the device, check the power cable and plug for
damage.
Never operate the device with damaged power cable or plug!
WARNING
W5.0008
Risk of death caused by an electric shock
Penetration of water if the mains plug is not fully plugged in
If the IEC connector is not fully plugged in to the IEC appliance socket,
water may enter the socket causing an electric shock.
Only operate the device with the IEC connector fully plugged in.
NOTICE
N11.0002
Setting up the device
Disconnecting the device from the mains
A separation of the device from the mains must be possible at any time.
Set up the device in such a way, that the connection for the power
cable is always easily accessible.
NOTICE
N12.0004
Setting up the device
Vibrations during operation
Depending on the operating mode of the device, slight vibrations may
occur.
Set up the device only on a vibration-free, plane and stable surface.
During the first commissioning the control panel shows a window to select the language.
Select the desired language for the control panel.
After the language setting, the date and time can be set.
Set the current date.
Confirm the input by pressing the [Done] button.
Set the current time.
Confirm the input by pressing the [Done] button.
5.1 Commissioning of the Cooling
NOTICE Before putting into operation, the coolant tank on the backside of the device must be
filled with coolant.