2.2 INSTALLATION
DOC01-V6ULB+ 13
2.2 Pre-commissioning check
The following checks are necessary to ensure that no damage has occurred during
transport of the bed:
(if applicable) Check the packaging for visible damage;
(if applicable) Unpack the unit;
Visually check that the unit is in good condition;
Connect device power cable
Leave appliance plugged in for at least 48 consecutive hours
Then check that each function of the device operates in accordance with the
operating instructions provided in this manual (see section 3).
Disconnect the power cable and operate the motors to check the battery.
If any damage or malfunction appears on the bed, please contact Rotec International's
technical service department without hesitation.
WARNINGS ON CHECKING BEFORE COMMISSIONING
Ensure that power cables from nearby electrical devices do not become
entangled in moving parts of the unit. Continued use of the device under these
conditions may result in SERIOUS ELECTRICAL INJURY.