6.14 REPAIR PROCEDURES
DOC01-V6ULB+ 65
6.14 CPR cable replacement
Tools required :
•7/16" wrench
Procedure:
1. Raise the bed to its
highest position and
apply the brakes.
2. Unplug the power cord
from the wall socket.
3. Locate the CPR handle.
4. Using a 7/16" wrench, loosen locknut (A).
5. Disengage the cable from the support and the lead from the handle and remove
the cable.
6. For instructions on removing and installing motor-side cables, see section 6.12.
7. Reverse the above steps to install the new cable.
8. Check that the handle is working properly before putting the bed back into
service.
Lead
Support