The installation is then controlled via the automatic systems in accordance with the configuration of the application:
inversion of normal/emergency source
grid coupling
etc.
Tests
If no faults are present, automatic mode can be activated by pressing
A
uto.
The test starting phase is then initiated after pressing
1 on the test keypad.
Pressing
1 on the test keypad brings up the following window for selecting the test type.
15/07/09 19 : 10 :00 GS 1 Operation Manu Faults Alarms
I1(A) 2701 F.P 0,9 L
Q (kVAr)
Speed (rpm) 1505
765
Operating time: 10 :05
+ Speed - Speed + U -U
- 1 -
Function keys
- 2 -
Synchronisation column
- 3 -
Power plant
measurements summary
Using the KERYS Tactil Man-Machine Interface, the under
load test is started by pressing the corresponding key.
Using the KERYS Tactil Man-Machine Interface, the off load
test is started by pressing the corresponding key.
Test selected
Select the test to be carried out
Under load
test
Esc
No load
test