EasyManua.ls Logo

Siemens 1FP1/3 - Terminal Box; Paint Finish

Siemens 1FP1/3
140 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Measuring nipple for SPM shock pulse measurement for bearing monitoring
Backstop
Bearing temperature sensors
Note
Further documents
Observe all of the other documents provided with this machine.
Supplementary devices
Depending on the order, various supplementary devices can be installed or mounted. These
include temperature sensors for monitoring bearing temperatures or winding temperatures, for
example.
3.3.8 Terminal box
As an option, additional connecting terminals are available in the terminal box for monitoring
equipment. For larger machines, an additional terminal box can be optionally mounted. You can
see the number of available terminals in the circuit diagrams.
3.3.9 Paint 󹪝nish
Paint 󹪝nish
The machine is painted according to the instructions in your order.
Description
3.3Installation
1LE1, 1FP1/3, 1PC1/3 shaft height 63 ... 315
Operating Instructions, 11/2023, A5E38483075A 29

Table of Contents

Related product manuals