Connection
4.2 Connections
34 Equipment Manual, 09/2022, L1V30415168B-03
4.2 Connections
All terminals are fitted with sealable terminal covers.
Figure 4-1 Pin assignment
°
Current transformer connection IL1, input
Current transformer connection IL1, output
Current transformer connection IL2, input
Current transformer connection IL2, output
°
Current transformer connection IL3, input
Current transformer connection IL3, output
Voltage connection phase L1
Voltage connection phase L2
Voltage connection phase L3
AC: Conductor (phase-to-neutral voltage)
DC: Connection: +
AC: Connection of neutral conductor
DC: Connection -
Sealing eyelets for sealing the terminal