EasyManua.ls Logo

Siemens SIMATIC CPU 410

Siemens SIMATIC CPU 410
434 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Supplementary information
18.7 Communication services
CPU 410 Process Automation/CPU 410 SMART
312 System Manual, 05/2017, A5E31622160-AC
Integration into STEP 7
S7 communication offers communication functions through configured S7 connections. You
use STEP 7 to configure the connections.
S7 connections with an S7-400 are established when the connection data is downloaded.
18.7.5
S7 routing
Properties
You can access your S7 stations beyond subnet boundaries using the programming device /
PC. You can use them for the following actions:
Downloading user programs
Downloading a hardware configurations
Performing test and diagnostic functions
Requirements
The network configuration does not exceed project limits.
The modules have loaded the configuration data containing the latest "knowledge" of the
entire network configuration of the project.
Reason: All modules connected to the network gateway must receive routing information
which defines the paths to other subnets.
In your network configuration, the PG/PC you want to use to set up a connection via
gateway must be assigned to the network to which it is physically connected.
The CPU must be configured as the master.

Table of Contents

Related product manuals