10.7.9 Installing Perfect Harmony Power Cells
To Install the Power Cell:
1. Be sure to use proper PPE.
2. Using the Siemens cell lifter, line up the power cell with its slot.
3. Push the cell into its slot. Do not lift up on the cell, but instead let it slide in on the power cell
mounting rails.
Maintenance
10.7 Remove and Replace
Type 6SR5 Air-Cooled
86 Operating Instructions, AK, A5E39390112