© Mar. 2023 142 AB16EJ Plus Maintenance Manual
APPENDIX
Table 12-1 Inspection and Preventative Maintenance Schedule (Continued)
Items
Intervals
Before each
delivery
1
or
quarterly
2
Semiannually
3
Annually
4
Battery
1, 2, 6, 9, 12 1, 2, 6, 9, 12 1, 2, 6, 9, 12
Electrolyte
6 6 6
Charging function
3 3 3
Instrument, meter, switch, lamp,
horn
1, 3 1, 3 1, 3
Functions and controls
Platform controller
1, 3, 4, 7, 10 1, 3, 4, 7, 10 1, 3, 4, 7, 10
Ground controller
1, 3, 4, 7, 10 1, 3, 4, 7, 10 1, 3, 4, 7, 10
Function control lock, protective
device and brake
1, 3, 10 1, 3, 10 1, 3, 10
Foot switch
1, 3, 10 1, 3, 10 1, 3, 10
Emergency stop button (turntable
and platform)
1, 3, 10 1, 3, 10 1, 3, 10
Limit switch and main power switch
1, 3, 10 1, 3, 10 1, 3, 10
Overload limit system
1, 3, 10 1, 3, 10 1, 3, 10
Tilt alarm device
1, 3, 10 1, 3, 10 1, 3, 10
Drive brake
1, 3, 10 1, 3, 10 1, 3, 10
Rotation brake
1, 3, 10 1, 3, 10 1, 3, 10
Other inspection items
Operation Manual in the manuals
storage box
10 10 10
All decals/labels complete, clear and
secure
10 10 10
Annual inspection date
/ / 10
No unapproved changes or
additions
10 10 10
All safety publications included
10 10 10
General structural components and
welds
2 2 2
All fasteners, pins, protective guards
and covers
1, 2 1, 2 1, 2
Grease and lubricating to
specifications
10 10 10
Functional test of all systems
10 10 10
Paint and appearance
5 5 5
Inspection date stamped on the
frame
/ / 12