© March 2023
60
AB16EJ Plus Operation Manual
MAINTENANCE
Table 10-6 Inspection and Preventive Maintenance Schedule(Continued)
Items
Intervals
Before each
delivery
1
or quarterly
2
Semiannually
3
Annually
4
Hydraulic oil
5, 6 5, 6 5, 6, 11
Electrical system
Electrical wiring, connector
1, 2 1, 2 1, 2
Battery
1, 2, 6, 9, 12 1, 2, 6, 9, 12 1, 2, 6, 9, 12
Electrolyte
6 6 6
Charging function
3 3 3
Instruments, gauges, switches,
lamps, horn
1, 3 1, 3 1, 3
Functions and controls
Platform Controls
1, 3, 4, 7, 10 1, 3, 4, 7, 10 1, 3, 4, 7, 10
Ground controls
1, 3, 4, 7, 10 1, 3, 4, 7, 10 1, 3, 4, 7, 10
Function control lock, secondary
guarding device and brake
1, 3, 10 1, 3, 10 1, 3, 10
Foot switch
1, 3, 10 1, 3, 10 1, 3, 10
Emergency stop button (ground and
platform)
1, 3, 10 1, 3, 10 1, 3, 10
Limit switches and main power
switch
1, 3, 10 1, 3, 10 1, 3, 10
Pothole protection device (if
equipped)
1, 3, 10 1, 3, 10 1, 3, 10
Overload limit system
1, 3, 10 1, 3, 10 1, 3, 10
Tilt alarm
1, 3, 10 1, 3, 10 1, 3, 10
Drive brake
1, 3, 10 1, 3, 10 1, 3, 10
Slewing brake
1, 3, 10 1, 3, 10 1, 3, 10
Other inspection items
Operation Manual in the manuals
compartment
10 10 10
All decals/labels complete, clear and
secure
10 10 10
Annual inspection date of the
machine
/ / 10
No unapproved changes or
additions
10 10 10
All safety publications taken into
account
10 10 10
General structural components and
weldments
2 2 2
All fasteners, pins, protective guards
and covers
1, 2 1, 2 1, 2