98
Section 5 – Procedures Wear Pad Replacement
5.13-5 Install the mast cable
1. Insert the end of the mast cable without the
housing down mast 1 and out through the base of
the mast.
2. The mast cable has tape markers at specific
intervals so you know where to clamp it on the
cable carriers at the top of each mast.
3. Use the three cable clamps removed earlier to
secure the mast cable to the cable carrier in three
places.
4. Lower the rest of the mast cable down mast 1
while you install the next mast section.