Section 5 – Procedures Platform Removal
5.7 Platform Removal
1. Disconnect the platform control cable from the
mast electrical housing.
2. Use a screwdriver to open the housing so you
can see the wire connections.
3. Remove the limit switch connections from the
mast electrical housing.
4. Loosen the strain relief from the bottom of the
housing and pull out the limit switch wires.
5. Attach the platform control and limit switch
cables to the platform railing using tie wraps.
6. Remove and set aside the three bolts that secure
the traverse platform to the lower platform.
7. Extend the platform a little bit so you can access
the front rollers.
8. Remove and set aside the two front rollers.

Table of Contents

Other manuals for Skyjack SJ20

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Skyjack SJ20 and is the answer not in the manual?

Skyjack SJ20 Specifications

General IconGeneral
BrandSkyjack
ModelSJ20
CategoryLifting Systems
LanguageEnglish

Related product manuals