Scheduled Maintenance Inspections Section 1 – Scheduled Maintenance
1.6-10 Platform
Platform Assembly (B)
Ensure there are no loose or missing parts and
there is no visible damage.
Ensure all fasteners are securely in place.
Ensure fall protection anchorage(s)
1
are
secure and there is no visible damage.
Ensure all railings
2
are properly positioned
and secured.
Ensure the gate/drop bar
3
is in good
working order.
Ensure the footswitch
4
is in good working
order and has not been modified, disabled or
blocked.
Ensure the AC outlet
5
has no visible damage
and is free from dirt or obstruction.
6
Platform Control Console (B)
Ensure all switches/controllers are returned to
neutral.
Ensure there are no loose or missing parts and
there is no visible damage.
7
Manuals
Ensure a copy of the operating manual and
other important documents are enclosed in the
manual storage box.
Check to be sure the manual storage box is
present and in good condition.
Ensure the manuals are legible and in good
condition.
Always return manuals to the manual storage
box after use.
1
7
6
2
3
4
5

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Skyjack SJ30ARJE and is the answer not in the manual?

Skyjack SJ30ARJE Specifications

General IconGeneral
BrandSkyjack
ModelSJ30ARJE
CategoryBoom Lifts
LanguageEnglish

Related product manuals