Procedure:
1. Remove 4cm of the cable sheath.
2. Shorten the cable shield to approximately 5mm.
Fold the surplus cable shield back onto the cable
sheath.
3. Shorten unused insulated conductors flush with
the cable sheath.
4. Strip off the conductor insulation by 6mm.
5. Release the pin connectors of the four-pole plug
with a screwdriver. Insert the insulated
conductors into the contact pins 1 and 2 of the
four-pole plug.
6. Write down the color of the insulated conductors.
7. Connect the four-pole plug to the pin connector
assigned to the corresponding energy meter.
Insert the four-pole plug into the lower pin row:
• For purchased electricity meters, insert the four-pole plug into the pin connector Meter1.
• For feed-in meters, insert the four-pole plug into the pin connector Meter2.
• For PV production meters, insert the four-pole plug into the pin connector Meter3.
• For bidirectional meters for grid feed-in and purchased electricity, insert the connection
plug of the cable for purchased electricity into the pin connector Meter1. Insert the
connection plug of the cable for grid feed-in into the pin connector Meter2.