Procedure:
1. Mount the top-hat rail power supply unit on the top-hat rail (see the top-hat rail power supply
unit documentation).
2. Connect the cable for the SunnyHomeManager to the top-hat rail power supply unit (see the
top-hat rail power supply unit documentation). Shorten the unused insulated conductors flush
with the cable shield.
3. Write down the color of the insulated conductors.
Terminals on the top-hat rail power sup-
ply unit
Insulated conductor color
DC+
DC-
4. Remove 4cm of the cable sheath at the other end of the cable.
5. Shorten the cable shield to approximately 5mm.
Fold the surplus cable shield back onto the cable
sheath.
6. Shorten unused insulated conductors flush with
the cable sheath.
7. Strip off the conductor insulation by 6mm.
8. Release the pin connectors of the four-pole plug
with a screwdriver. Insert the DC- insulated
conductor into pin 3 and the DC+ insulated
conductor into pin 4 of the four-pole plug.
9. If no energy meter is connected to the four-pole plug, insert the four-pole plug into the lower
contact pin row of any one of the pin connectors on the SunnyHomeManager.
7 Connection
SMA Solar Technology AG
Installation ManualHoMan-IA-en-2050