EasyManuals Logo
Home>SMC Networks>Chiller>HRSH Series

SMC Networks HRSH Series User Manual

SMC Networks HRSH Series
200 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #34 background imageLoading...
Page #34 background image
HRX-OM-Q026
Chapter 3 Transport and Setting Up
3.3 Installation HRSH Series
3-14
3.3.3 Preparation and wiring of power supply cable
Be sure to lock out and tag out the breaker of the facility power supply
(customer power supply facility) before wiring.
The electrical facilities should be installed and wired in accordance
with local laws and regulations of each country and by a person
who has knowledge and experience.
Check the power supply. Operation with voltages, capacities and
frequencies other than the specified values can cause fire and
electric shock.
Wire with an applicable cable size and terminal. Forcibly mounting
with an unsuitably size cable may result in heat generation or fire.
Be sure to connect the power supply cable from the product side first,
and then connect the breaker of the facility power supply (the user’s
machine power supply).
When the panel is removed or mounted, be sure to wear protective
shoes and gloves to prevent injury with the edge of the panel.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the SMC Networks HRSH Series and is the answer not in the manual?

SMC Networks HRSH Series Specifications

General IconGeneral
BrandSMC Networks
ModelHRSH Series
CategoryChiller
LanguageEnglish

Related product manuals