03
02
1 Notes on this Manual
1.2 Target Group
1.3 Symbols Used
Warning!
“Warning" indicates a dangerous situation, which,
if not avoided, may result in serious injury or death.
1.1 Scope of Validity
Danger!
“Danger" refers to a dangerous situation that, if not
avoided, will result in a high level of risk such as serious
injury or even death.
5 Electrical Connections...........................................................32
.........................................................................................
5.2 Grid Port and EPS(Off-grid) Output Connection..........
5.3 EPS(Off-grid) Block Diagram.........................................................
..............................................................................5.4 Battery Connection
5.5 Communication Connection.......................................................
5.5.1 Introduction to DRM Communication.....................................
5.5.2 Introduction to Meter/CT Communication...........................
5.5.3 Parallel Communication.................................................................
5.5.4 COM Communication......................................................................
5.5.5 Communication Connection Steps...........................................
5.6 Grounding (Mandatory)....................................................................
5.7 Monitoring Connection....................................................................
5.8 Check All Below Steps Before Starting Inverter..............
5.9 Inverter Operation.................................................................................
6 Firmware upgrading...........................................................................................79
7 Setting.........................................................................................83
7.1 Control Panel............................................................................
7.2 Menu Structure.......................................................................
7.3 LCD Operation..........................................................................................
8 Troubleshooting............................................................ 120
8.1 Trouble Shooting..................................................................
8.2 Routine Maintenance.........................................................
9 Decommissioning........................................................127
9.1 Disassemble the Inverter...................................................
9.2 Packaging................................................................................
9.3 Storage and Transportation..............................................
9.4 Waste Disposal .......................................................................................
10 Disclaimer.......................................................................................128
* WARRANTY REGISTRATION FORM
5.1 PV Connection
32
36
37
46
50
50
51
54
60
62
71
74
76
77
83
84
85
120
126
127
127
127
127
Notes on this ManualContents
The following types of safety instructions and general information
appear in this document as described below:
X3-Hybrid-5.0-D
X3-Hybrid-5.0-M
X3-Hybrid-6.0-D
X3-Hybrid-6.0-M
X3-Hybrid-8.0-D
X3-Hybrid-8.0-M
X3-Hybrid-10.0-D
X3-Hybrid-10.0-M
X3-Hybrid-12.0-D
X3-Hybrid-12.0-M
X3-Hybrid-15.0-D
X3-Hybrid-15.0-M
X3-Hybrid-10.0K-D
This manual is an integral part of the inverter, it describes the
assembly, installation, commissioning, maintenance and failure of
the product. Please read it carefully before operating.
Note: "X3-Hybrid" Series refers to the energy storage inverter that
supports photovoltaic grid-connected.
“5.0"means 5.0kW.
“10.0K-D" is in compliance with C10/11.
“D" means with "DC switch", "M" means externally connected
with X3-Matebox.
The15.0kw inverter complies with Thailand’s PEA/MEA grid-
connected regulations.
Keep this manual available at any time.
This manual is for end customers and qualied electricians.The
tasks described in this manual only can be performed by qualied
electricians.