EasyManua.ls Logo

Still OCV 01 - Page 97

Still OCV 01
124 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
by the BMS and to ensure that the battery
will not be overcharged (once a month).
Check discharge protection equipment,
such as fast-acting fuses, AC contactors,
relays, etc., to ensure that the battery pack
can be quickly disconnected from the main
circuit in the event of a dangerous situation
such as short circuit or over current (once a
month).
Check the insulation resistance between
the battery pack and the vehicle body to
ensure that the resistance value meets the
Chinese national standard (≥500Ω/V) and
to ensure that there is no electric leakage
with the battery (once a month).
Operation
4
Lithium battery appendix
895091 801 1525EN-12/2022 - 06

Table of Contents