Installation, Operation, and Maintenance Manual
SUMMIT PUMP MODEL 2196 / 2196-LF / 2196-R / 2796 7
4. Locate the installation reference dimension on the seal installation drawing.
Normally this is the dimension from the face of the stuffing box to the rear of
the seal.
5. Mark the shaft with a felt marker or marking tool at the dimension (i.e. 1/32”).
6. Lubricate the shaft with silicon grease or soapy water. Slide the seal onto the
shaft. Line up the face of the seal with your mark and secure with set screw.
7. Reassemble the pump.