EasyManua.ls Logo

Summit 2196 model - Shut Down

Summit 2196 model
53 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation, Operation, and Maintenance Manual
SUMMIT PUMP MODEL 2196 / 2196-LF / 2196-R / 2796 11
4. Unlock power to the pump driver.
5. Slowly open the discharge valve as soon as the motor reaches operating speed.
6. Check stuffing box leakage and adjust, if necessary, to achieve leakage of 40-65
drops per minute.
7. Adjust the discharge valve as needed while checking piping for leaks.
8. Check mechanical operation of the pump and motor.
WARNING!
Do not operate the pump without the
proper guard. See ANSI/ASME
B15.1-1996.
SHUT DOWN
TO SHUT DOWN THE PUMP
1. Gradually close the discharge valve and turn off the power to the motor.
2. Lock out power to the pump driver.

Table of Contents

Related product manuals