OPERATION & MAINTENANCE MANUAL SWDE120B-3
1. Fall down the drilling frame to ground.
2. Push the accelerograph controlling rod to min. load position, and keep for about 5
minutes .
3. Turn the key to OFF position to shut the engine, then, take off the key from the switch.
4. Switch off the pilot controlled valve.