EasyManua.ls Logo

SUNWARD SWDE120B-3 - Dust Collection System; Regular Change of Hydraulic Hoses

SUNWARD SWDE120B-3
111 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OPERATION & MAINTENANCE MANUAL SWDE120B-3
74
7.4.9 Dust Collection System
Parts
Qty.
Interval (hours)
8
50
100
250
500
1000
2000
Laminar flow
dust absorption
core
Clean
1
Change
Exhausting gate
of dust collector
cyclone and
Laminar flow
dust absorption.
Check
seal
1
Air bag
Discharge
water
Connecting
pipes between
dust catcher and
dust hood
Check
seal
Change
Change immediately when there is leakage
or breakage
7.4.10 Regular Change of Hydraulic Hoses
To promise safe operation, please do daily check (before operating) and regular check.
If there is any question with the parts listed as below, it would result in serious fire damage.
It is difficult to check the following parts to decide if they are worn, aging only with eyes.
We recommend changing the parts at the interval time as following. However, change the
parts immediately once finding there is problem with any of them before operating. When
changing hoses, check the connector if there is deformation, breakage, or damage and change
it if necessary.
Do regular check on all the hoses and change them or tight them to avoid any bad effect.
Consult with the local delegated distributor for correct changing procedures.

Table of Contents

Related product manuals