EasyManua.ls Logo

Swan Analytical Instruments AMI Turbiwell - Longer Stop of Operation

Swan Analytical Instruments AMI Turbiwell
110 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
A-96.250.511 / 091120
AMI Turbiwell
Maintenance
74
6.6. Longer Stop of Operation
Do not switch off the instrument if your operation is suspended for
less than a week. Power consumption is very low and the turbidime-
ter remains ready for use.
If water hardness is very high, lime deposition may precipitate.
1 Stop sample flow.
2 Switch off power.
3 Empty measuring chamber by opening the drain valve. (With
automatic drain valve option, select <Maintenance>/<Drainage>/
<Manual operation>/<Motor valve>/<open> menu item).
4 If necessary clean the measuring chamber (see Cleaning the
Measuring Chamber, p. 56).

Table of Contents