15
TCS 3000 Installation
www.tcsmeters.com
Total Control Systems
Installaon Procedure — Addive Injecon Pump
There are two selecons for managing Addive Injecon Pumps; External and Piston.
EXTERNAL: The External funcon for Addive Injecon is to
provide an posive output signal during the enre delivery pro-
cess to manage an external addive injecon pump. The
source power voltage is what you will receive from the terminal
named PMP. START.
NOTE: If using Throle Control 1, this will deacvate the External addive injecon
pump.
Addive Meter: A single or dual channel addive ow meter
can be wired into the ADD. INJ. PULSER terminal to inde-
pendently measure addive volume during a ow rate. Cali-
brate Addive Meter within following PISTON addive selec-
on, then switch back to External.
BLACK
RED
BLACK
RED
GND — GND
+5V — VIN
TAHA2 — CHA
TAHB2 — CHB
PISTON: The Piston funcon for Addive
Injecon is to provide calibrated posive output
signals during the enre delivery process to actuate
an external addive injecon pump. The source
power voltage is what you will receive from the ter-
minal named ADD. INJECTOR VALVE.
Addive Meter: A single or dual channel addive
ow meter can be wired into the ADD. INJ. PULSER
terminal to independently measure addive volume
during a ow rate.
GND — GND
+5V — VIN
TAHA2 — CHA
TAHB2 — CHB
NOTE: Addive Injecon Pump and Valve terminals will not operate in Weights & Measures mode. Calibraon for the PISTON
addive injecon pump and ow meter are required to be performed outside W&M Sengs, then changed within W&M