Installaon Procedure — LPG 2-Stage Preset Valve
GREEN
BLACK
BLACK
S2 -Slow Flow Shut
O Solenoid Valve
Installaon Procedure:
1. Using the bolts and gasket provided, install the 757 LPG valve on the outlet (downstream) side of the meter.
2. Follow the instrucons provided with the valve for wiring the solenoid.
3. Mount the 3 Way Valve directly to the TCS3000 register and follow the instrucons provided with the Valve
*Note: Use Correct Thread Sealant*
4. Once the solenoid is wired, run the corresponding wire as pictured using a minimum of 18 gauge shielded cable
into the back of the TCS 3000 register. The 3-Way Valve will be wired into Solenoid 1 (S1) on the terminal board
and the Slow Flow Bypass Valve will be wired into Solenoid 2 (S2).
5. Insert the solenoid wiring into the cable gland. Wire the solenoid into the correct solenoid locaon on the termi-
nal board. Leave a small amount of slack on the wiring.
6. Compress the cable gland on the TCS 3000 register unl it is snug on the solenoid wire.
7. TCS 3000 register product programming for Valve Type should be set to Dual Stage.
*When Calibrang the Unit Set Up Valve Type as 1001*
S1 – Fast Flow
Solenoid Valve

Other manuals for TCS 3000

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the TCS 3000 and is the answer not in the manual?

TCS 3000 Specifications

General IconGeneral
BrandTCS
Model3000
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals