EasyManua.ls Logo

Technogym GROUP CYCLE - Technical Assistance

Technogym GROUP CYCLE
68 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GROUP CYCLE: Service & Maintenance manual rev. 6.4
Page 4.1
4 INSTALLATION AND HANDLING
INSTRUCTIONS
4.1 SPECIFICATIONS AND REQUIREMENTS
For correct machine installation, make sure that:
The machine is installed on a level surface that is free of vibrations and has sufficient
carrying capacity for the combined weight of the machine and user.
The place of installation is free of dust and sand.
The place of installation meets the operating temperature and humidity conditions specified
in paragraph: 2.4“Ambient specifications”.
4.2 INSTALLATION
The equipment’s installation and assembly procedure, are detailed on the relative
manual, supplied with the machine delivery.

Table of Contents

Other manuals for Technogym GROUP CYCLE

Related product manuals