5. MOVING AND INSTALLING THE EQUIPMENT
5.1 INSTALLATION SPECIFICATIONS AND REQUIREMENTS
WARNING: Refer to the relative specic manual: INSTALLATION REQUIREMENTS,
which can be consulted on TG DIRECT.
1. Place the equipment on a at surface, where there are no vibrations and where the loading
bearing capacity is sucient for the weight to be supported, also taking into consideration
the weight of the user.
2. Depending on the country where the equipment is to be delivered, it may be shipped partial-
ly dismantled, packed in cardboard packaging and xed to a pallet; or totally assembled in a
transparent plastic wrapping, xed to a wooden pallet.
3. The area is not dusty or sandy.
4. You have observed the temperature and humidity operating requirements indicated in para-
graph: “2.2 Environmental characteristics” on page 14.
Skillmill:
Technical Service Guide - Rev. 2.2
Page 35