Recovery and Transport 6
TC29
49
6 Recovery and Transport of the Machine
6.1 Recovery of the machine
The recovery of the machine should be
done by use of a crane if possible.
If the machine has to be towed for recovery, the
following tow fixing points are present:
eye (33/1) on the undercarriage
two drill holes (33/2) on the dozer blade
6.2 Loading the machine by use of a crane
Only use the original Terex crane lifting
harness!
Use a crane with sufficient weight-lifting
capacity of at least 3,000 kg.
To load the excavator onto a flat bed trailer, etc.,
the following activities must be carried out:
Empty and fold in the bucket.
Position the work equipment straight ahead.
Raise the boom until the height specified.
Retract the dipperstick.
Stop the engine.
Dismount from the excavator and close the
doors.
Suspend the excavator expertly on the points
marked using the 3-point crane lifting harness.
Take care that the spreader bar (34/1) is
correctly seated.
HR1433
1
2
2
2
Fig. 33-Tow fixing points
HR14-03-34
1
1
c
a
.
3
1
0
ca.1300
Fig. 34- Crane suspension

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Terex TC29 and is the answer not in the manual?

Terex TC29 Specifications

General IconGeneral
BrandTerex
ModelTC29
CategoryExcavators
LanguageEnglish

Related product manuals