EasyManua.ls Logo

Terex TW85 - Delivery and Handing-Over Instructions; Spare Parts, Warranty, and Maintenance Plan

Terex TW85
125 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DELIVERY AND HANDING-OVER
INSTRUCTIONS
The following checklist is to be followed when handing over the machine to
the dealer/ customer:
1. Operating instructions
The Operating Instructions should be read side by side, and be explained in
detail through practical training on the machine.
Items which are particularly important include:
Accident Prevention Regulations published by the employer’s liability
insurance associations in the users country
Technical data
Operator controls, indicating and warning elements
Checks before putting the machine into operation
Diesel engine running-in instructions
Starting and stopping the diesel engine
Explanation of hydrostatic travel drive
Driving
Recovery and transport of the machine
Operation of all functions
Explanation of maintenance intervals and points according to
Maintenance and Inspection Plan by demonstrating and explaining
maintenance points on machine
Lubrication intervals and points of lubrication according to lubrication chart
and demonstration of these points on the machine
Handing-over of Diesel Engine Operating Instructions
2. Spare parts list
Structure of Spare Parts List, Figures and the associated texts
Instructions for ordering spare parts - always state the type of machine,
the vehicle identification number ("Fz-Id.Nr."), parts designation, complete
spare part number, number of pieces, delivery address, etc.
3. Warranty
Explanation of warranty stipulations
Explanation of inspection cards and note on maintenance and inspection
plan.
Explanation of how to fill out the warranty/handing-over card correctly and
how to return to Terex
Wheeled excavator
TW85
Maintenance and Inspection Plan
The careful performance of all prescribed inspections is the best prerequisite
for the machines continuous readiness for operation.
All maintenance work mentioned should therefore be performed in the
prescribed sequence with the machine being in warm condition.
The inspections are obligatory.
Failure to do so may adversely affect our warranty coverage.
The machine must be thoroughly cleaned before inspection takes place.

Table of Contents

Related product manuals