Working operation of the machine 5
TW85 53
5.3.4 Operation – support legs / support plate
With support plate attached, the control
levers (35/2) and (35/3) must be
activated simultaneously.
5.3.5 Operation – front dozer blade (option)
• Change-over switch (36/61) – front dozer blade
/ support leg, left
HM32-035
3
2
links
left
gauche
rechts
right
droite
Fig. 35 Operation
P
HM32-036
61
2
links
left
links
left
gauche
Fig. 36 Operation