EasyManua.ls Logo

Tescom ACT6000 - 15. Appendix 2 - DPBO verification; STEP 1

Tescom ACT6000
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ACT6000 User Guide January 2021 Page 51 of 52
15. Appendix 2 - DPBO verification
STEP 1
The first step is to extrapolate and save on the internal memory the “ESEL and “A-B-C”
parameters (useful for the second step) from the results of the SELT Sequence performed
on the primary sector of the line (Central to Cabinet), using the ADSL2+ mask, as the
following scheme.

Table of Contents

Related product manuals