36
Assembly step(13)drawing
Assembly step(13)assembly instrucon
A1
U
V
X
Y
Z
W
1. Remove low pull cable(70) end equipped ball head down
2
. Low pull cable(70)head down end from point U according through point: V,W,X,Y,Z,A1
final installed ball head back to cable
. Connect 9 link chain & snap hook(60) with low pull cable(70),
9 link chain & snap hook(60) other end connect with short bar(71)