EasyManua.ls Logo

Toro 41177 Multi-Pro 1250 - Completing the Setup: Learning more about your product

Toro 41177 Multi-Pro 1250
76 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
the time of man ufacture to allo w the booms to
be in this position for transit. Before operating
the mac hine , the springs m ust be adjusted to the
cor rect compression.
1. If necessar y , remo v e the pac king components
that secure the right and left extension booms
during shipping .
2. Suppor t the booms while they are extended
to the spra y position.
3. At the boom hing e , measure the compression
of the upper and lo w er springs while the booms
are in their extended position ( Figure 8 ).
A. All springs m ust be compressed until they
measure 1.56 inc hes .
B . Use the jam n ut to compress any spring
that measure g reater than 1.56 inc hes .
Figure 8
1. Boom hinge spring
2. Jam nut
4. R e peat the procedure for eac h spring on both
boom hing es .
5. Mo v e the booms into the transpor t “X”
position. See Operating the Booms in
Operation , pag e 25 for more infor mation.
Step
4
Completing the Setup:
Learning more about your
product.
Parts needed for this step:
1
Ignition key
1
Operator’s Manual
1
Engine Operator’s Manual
1
Parts Catalog
1
Operator Training Material
1
Registration Card
1
Pre-delivery Inspection Sheet
Procedure
1. R ead the man uals .
2. View the Operator training material.
3. Complete the registration card and retur n to
T oro .
4. Store the documentation in a safe place .
16

Table of Contents

Related product manuals