1. System Configuration
8
z
Transporting Passage/Truck Parking Lot
For transporting, the preparation should be made for smooth working by securing the
transporting passage to the building, parking place, and unloading and unpacking places in
advance.
z
Unloading Transporting Work
The unloading and transporting works must be carefully done paying attention to the following
items.
1)
For unloading from a truck/vehicle, the roping or wire applying must be done at two or more
points and the load should be uniformly imposed on the ropes/wires (Figure 1.4).
Example 2: bad ropingExample 1: good roping
θ
60
°
θ
θ
θ
>
60
°
: dangerous
If rope or wire is applied at these places,
it is dangerous because it tends to slip.
Rope or wire must be applied at
places as shown here.
Figure 1.3 Method of Applying Rope/Wire
2)
The ropes/wires to be used must conform to the standard and must sufficiently withstand the
load.
3)
Avoid impact when unloading. To stack two or more units must be avoided.
4)
For transporting, use a forklift, etc. and be careful not to give impact.
5)
When working, pay due attention to the handling marking shown on the package.

Table of Contents

Other manuals for Toshiba TOSDIC-CIE DS

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Toshiba TOSDIC-CIE DS and is the answer not in the manual?

Toshiba TOSDIC-CIE DS Specifications

General IconGeneral
BrandToshiba
ModelTOSDIC-CIE DS
CategoryControl Systems
LanguageEnglish

Related product manuals