EasyManua.ls Logo

Travis Industries ProBuilder 42 - Page 18

Travis Industries ProBuilder 42
62 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
18 Installation (for qualified installers only)
© Travis Industries 3/13/18 - 1474 42 & 54PB GSB2 Aust.
4 The (2) header standoffs are screwed down flat to front edge of the top of the fireplace. On each
standoff, remove the screw that is closest to the center of the fireplace (keep screw for reinstallation).
Bend the legs at the perforations as shown below and attach the foot of the standoff to the top of the
fireplace using the screw removed earlier in this step.

Table of Contents