60 Installation (for qualified installers only)
© Travis Industries 3/13/18 - 1474 42 & 54PB GSB2 Aust.
13 Replace the dashboard.
14 Verify wires are not touching the bottom of the firebox. Adjust if necessary.
15 Install the included (4) AA batteries into the battery box.
16 Install the included (3) AAA batteries into the transmitter.
17 See operating instructions for instructions on how to synchronize the transmitter to the control
module.