COMMANDER / EMBASSY
4.20 ENERGY MANAGEMENT SYSTEM (EMS) OPTION AVAILABLE
Fig. 4-36 OPTIONAL 30 AMP EMS
This system prioritizes and distributes the power
from the shoreline or generator to the appliances
or other 120 V users. This system disconnects
selected “postpone-able” power draws to elimi-
nate or minimize the tripping of circuit breakers.
The selected power draws are automatically
turned back on when the higher priority power
The control box is located on the panel above
the coach entry doorway and the monitoring
microprocessor is mounted in the electrical AC
breaker box. No setting or adjusting by operator
Normally the postpone-able power draws are
the air conditioner, washer/dryer and electric
water heater. Each will be shut down as other
demands increase. Refer to the booklet in the
information package for more details.
Fig. 4-37 OPTIONAL 50 AMP EMS
Fig. 4-37 OPTIONAL 50 AMP EMS
IMPORTANT
You will fi nd that not all campgrounds
are equipped with 50-amp service. In
that case, you will need an adapter
plug to connect to the standard 30-
amp service.
The 50-amp service allows you to run more
equipment such as both air conditioners at the
same time, without tripping the circuit breakers.
Fig. 4-38 SHORELINE PLUG (TYPICAL)
Fig. 4-38 SHORELINE PLUG (TYPICAL)