EasyManua.ls Logo

Tuttnauer EA - Installation, Placing and Leveling

Tuttnauer EA
72 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4.
INSTALLATION
INSTRUCTIONS
4.1
INSTALLATION,
PLACING
AND
LEVELING
Installation,
Placing
and
Leveling
|
Network
Network
and
connection
should
comply
to
the
devices
consumption.
It
must
comply
to
local
installation
and
safety
rules
and
regulations.
The
voltage
supplied
to
the
device
must
comply
with
the
label
+
5%.
Caution:
The
sterilizer
must
be
placed
on
a
rigid
and
leveled
surface.
The
stand
must
be
able
to
hold
the
load
of
the
device
and
loaded
material.
Connect
the
power
cord
to
the
socket
on
the
rear
side
of
the
autoclave;
plug
it
into
the
supply
socket.
The
amount
of
distilled
water
in
the
autoclave
chamber
necessary
for
each
Sterilization
cycle
is
as
follows:
1730
-
2340
2540
3850
3870
10
OZS.
12
OZS.
12
OZS.
21
OZS.
24
OZS.
300
ML
350
ML
350
ML
600
ML
700
ML
The
legs
(2)
of
the
autoclave
are
factory
set
for
the
autoclave
to
hold
this
amount
of
water
when
the
autoclave
stands
on
a
level
surface
(3).To
check
the
water
level
fill
a
beaker
(4)
with
water
with
reference
to
the
above
table,
pour
the
water
into
the
chamber.
The
water
must
reach
the
indicator
groove
(5)
in
front
of
the
chamber
and
the
tip
of
the
electrode
located
at
the
rear
of
the
chamber.
If
it
is
necessary,
raise
the
front
legs
in
order
to
get
the
proper
amount
of
water.
IT
IS
IMPERATIVE
TO
HAVE
THE
CORRECT
AMOUNT
OF
WATER
FOR
THE
PROPER
OPERATION
OF
THE
AUTOCLAVE.
NOTE
:
Keep
the
back
and
the
right
side
of
the
autoclave
approximately
1”
(25
mm)
away
from
the
wall
to
allow
for
ventilation.
19

Related product manuals