YK11-0016-DI-002-08
64
6.2 Regular Check
Although you have to consider checkpoints depending on the use of the Pump, you should check
the following regularly; it is helpful to avoid trouble and extend the pump life cycle.
WARNING
Check and ensure that any of hazardous energy is blocked before
starting the operation.
Entitled staff should conduct the wiring operation.
Erroneous wiring work might cause a fire.
Conduct the wiring operation correctly in compliance with laws and
rules concerning the safety (e.g. Fire Defense Law, Electric
Equipment Technology standard, Internal line cord) in the country
and region you use the product.
Ensure to have a correct grounding.
You have a risk of getting electrical shock in case of failure or
electric leakage.
You are recommended further to install a dedicated earth leakage breaker.
It is imperative to put the Overload protection device.
Otherwise it would cause the motor burn out and/or fire.