VX 680 INSTALLATION GUIDE 15
CHAPTER 2
Terminal Setup
This chapter describes the terminal setup procedures. You will learn about:
• Selecting Terminal Location.
• Unpacking the Shipping Carton.
• Examining Terminal Features.
• Examining Connection Ports.
• Establishing Telephone Line Connections.
• VX 680 Bluetooth
®
Support.
• Installing the Paper Roll.
• Installing and Replacing MSAM Cards.
• Installing the SIM or R-UIM Card (GPRS and CDMA Models).
• Installing and Replacing SD Card.
• Installing the Smart Battery.
• Using the Smart Battery.
• Battery Behavior (No Power Cable).
• Removing the Smart Battery.
• Charging the Smart Battery.
• Connecting the Terminal Power Pack.
• Using the Base Station.
• Mounting the Terminal Onto the Base Station.
• Attaching the USB Dongles to the Base Station.
• Charging the Spare Battery on the Base Station.
• Conducting Wireless Transactions.
• Conducting Smart Card Transactions.
• Conducting Bluetooth
®
Transactions
• Using the Magnetic Card Reader.
• Using the Stylus.