EasyManua.ls Logo

Wacker Neuson 2503

Wacker Neuson 2503
280 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OM 25-3503 us – Edition 4.1 * 2503_3503b330.fm 3-65
Operation
Raise the floor mat on either side.
Remove screws F on either side.
Raise the machine as follows:
Do not allow anyone to stay in the cabin, and close the doors and the engine cover.
Slowly raise the cabin.
NOTICE
Inspect the cabin for damage as you raise it.
Set down the cabin safely and ensure that it cannot tip over.
Fig. 159: Left cabin attachment
F
Fig. 160: Right side cabin attachment
F
Fig. 161: Crane-lifting

Table of Contents

Related product manuals