EasyManua.ls Logo

Wacker Neuson 2503

Wacker Neuson 2503
280 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5-34 OM 25-3503 us – Edition 4.1 * * 2503_3503b530.fm
Maintenance
Putting into operation again
Remove the grease from the piston rods.
Install or connect the battery.
Remove the seals from the exhaust pipe and the air filter intake.
Check the condition of the air filter cartridges and replace them if necessary.
If the machine was out of service for over 6 months, change the oil in the gearbox,
engine and other units.
Also replace hydraulic oil filters (return and breather filters) if the machine has been out
of service for over 6 months.
Lubricate the machine according to the lubrication plan.
Add a little engine oil.
Check the levels.
Remove the cutoff solenoid from the engine.
Let the engine run 10 seconds.
Wait 1 minute.
Let the engine run 10 seconds again.
Fit the cutoff solenoid back on again.
Start the engine and let it run without any load.

Table of Contents

Related product manuals