EasyManua.ls Logo

Wacker Neuson 2503

Wacker Neuson 2503
280 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OM 25-3503 us – Edition 4.1 * 2503_3503b530.fm 5-27
Maintenance
Threaded fittings and attachments
All threaded fittings must be checked regularly for tightness, even if they are not listed in
the maintenance schedules.
Engine fastening screws
Fastening screws on the hydraulic system
Line, bucket teeth and pin fastenings on the attachment
Retighten loose connections immediately. Contact a Wacker Neuson service center if nec-
essary.
Pivots and hinges
All mechanical pivot points on the machine (for example door hinges, joints) and fittings
(for example door arresters) must be lubricated regularly, even if they are not listed in the
lubrication plan.
5.14 Lubrication points
Lubricate the lubrication points with the green caps once a week.
Lubricate the lubrication points with the blue caps daily.

Table of Contents

Related product manuals