EasyManua.ls Logo

WarmFlow GS25A - Unpacking

Default Icon
66 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION INSTRUCTIONS
TR05A140.B1107
16
4.2 Unpacking
The materials (cardboard) used for packing the appliance are fully recyclable.
It is recommended that the packing material is only removed when the appliance is ready to be installed.
The manufacturer will not be held responsible for damage caused by incorrect storage of the product.
Packing materials (plastic bags, polystyrene, nails, etc.) must not be left within reach of children, in that
these items represent a potential hazard.
A. With the packed appliance on
the floor (see Figure 7), remove
the staples and open out the four
flaps on the end of the box;
B. Stand the boiler up on its end
as shown, supporting it from
underneath;
C. Lift off the box and remove all
packaging.
STORAGE & HANDLING
Please note that prior to
installation, the boiler should be
stored in the horizontal position
with no more than 5 boilers to a
stack;
Ensure that the boilers are stored
in dry conditions and be aware
that the carton is a two-man lift.
B
C
A
Figure 7: Unpacking instructions

Table of Contents

Related product manuals